wsdot logoEASTON – Work to repair deteriorated sections of Interstate 90 near Easton is still scheduled to take place Saturday. Next week construction-related delays continue east of Snoqualmie Pass.  The Washington State Department of Transportation plans to remove and replace sections of deteriorating asphalt in the westbound lanes between Easton and the Cabin Creek area between mileposts 63 to 67. Drivers should plan for delays between 5 a.m. and 8 p.m. on Saturday, April 29. This work is weather dependent and may need to be canceled and rescheduled.

Drivers will experience delays due to daytime rolling slowdowns and nighttime lane closures east of the Snoqualmie Pass Summit to the Price Creek area between mileposts 57 to 62. The eastbound lanes near Cle Elum between mileposts 87 to 93 will be reduced to a single lane 24 hours a day Monday, May 1 through Friday, May 5.

Bridge deck repairs start in various locations on Monday, May 1 and will cause delays for drivers during the day throughout the week due to lane closures in both directions near Easton between mileposts 75 to 76 and Ellensburg between mileposts 97 to 98.

WSDOT provides a variety of tools to help plan your trip over Snoqualmie Pass:

Add comment


Security code
Refresh